Wednesday 15 July 2015

Final Assignment (Working Drawing + System Integration)

We are required to produce a set of working drawing which included
1.Setting Out Plan
2.Furniture Layout Plan
3.Reflected Ceiling Plan
4.Section
5.Water Supply System
6.Detail Drawing
Setting Out Plan
Furniture Layout Plan
Partial Reflected Ceiling Plan
Electrical Layout Plan
                                     
Water Supply System
Detail Drawing
and here's the picture of me submitting my final assignment. :)

Individual Project - Journal Sketches

We need to observe and study on the building joineries and discover the interior detailing that related to final project design studio. We are required to sketch a minimum of 20 detailing sketches that covers floor, wall, ceiling and interior fit-out of the chosen interior space.
From this assignment, we are able to gain the knowledge and understanding to the production of working drawings.
Here is some of my sketches :
furniture from bbq shop

sofa from cafe in subang jaya

furniture (bar counter)

furniture (bar counter)

japanese restaurant (furniture)

fling stone cafe ( furniture)

door from cafe

restaurant in sunway pyramid (wall)
restaurant (wall)

restaurant (wall)

grey sky morning cafe (bookshelves)
from cafe in suunway pyramid (ceiling)
from cafe in sunway pyramid (lighting)


grey sky morning cafe (furniture)